Greenock Ocean Terminal

Project Description

SSE completed the full supply and installation of structural steel frame throughout the winter on the exposed west coast of Scotland.

The steel frame included 15.7 Tonnes of curved steel which required us to engage early with our supply chain in order to source and complete the process of multiple different members requiring specialist curvature treatment.

Client: Heron Bros

Project Type: Cruise Ship Visitor Centre

Steel Tonnage: 178T

Project Location: Inverclyde, Scotland

  • Greenock Ocean Terminal
  • Greenock Ocean Terminal
  • Greenock Ocean Terminal
  • greenock cruise ship visitor centre - under construction by structural steel engineering
  • greenock cruise ship visitor centre - under construction by structural steel engineering
  • greenock cruise ship visitor centre - under construction by structural steel engineering
Scroll to Top