Ebrington Plaza, Office Building
Project Description
Struct Steel Engineering worked closely with Heron Bros to ensure a quality project was delivered on a phased basis to allow other trades to commence work on site and meet the tight program requirements of this project.
Struct Steel Engineering completed all connection designs as well as fabrication, coatings and full erection of steel frame including all cranage and access equipment.
We also undertook the supply and installation of 5900 SQ/M of metal decking along with all shear studding completed on site by Struct Steel Eng’s own in house team and equipment.
- Steel connection design
- Detailing, fabrication & erection of Structural Steelwork
- Supply & Installation of 5900 SQ/M of metal decking, edge trim and safety netting.
- Application of site welded shear studs.
- Installation of all precast stair flights to 3 Nr stair cores.
Client: Heron Bros
Project Type: New 5 Story Office Building
Steel Tonnage: 350T
Project Location:L/Derry – Derry