Various Retail Stores
Project Descriptions
Lidl Stores
For all LIDL retail projects, SSE are responsible for the full design package including all detailing and connection design calculations.
From the order is placed, the full steel frame can be delivered to site within 6 working weeks and erected onsite within 9 working days.
- SSE have completed structural steel frames to 17 Nr Lidl stores to date including steel frame, plant decks, open floor grating, access ladders, intumescent coatings, etc.
- Geographical locations: (various) throughout England and Wales.
Tesco Stores
- SSE have completed structural steel frames to offices and shops for Tesco
- Geographical locations: London
Aldi Stores
- SSE have designed, detailed, fabricated and erected the structural steel frames to a number of Aldi stores
- Geographical locations: (various) throughout Ireland
Primark Stores
- SSE have designed, detailed, fabricated and erected the structural steel plant decks for Primark
- Geographical locations: Omagh, N. Ireland
Maxol/ Centra Stores
- SSE have designed, detailed, fabricated and erected the structural steel frames to a number of different Maxol Filling Stations and Centra shops
- Geographical locations: (various) throughout Northern Ireland
Client: Various
Project Type: Various Retail Stores
Project Location: Across all the UK & Ireland