Ebrington Plaza, Office Building

Project Description

Struct Steel Engineering worked closely with Heron Bros to ensure a quality project was delivered on a phased basis to allow other trades to commence work on site and meet the tight program requirements of this project.

Struct Steel Engineering completed all connection designs as well as fabrication, coatings and full erection of steel frame including all cranage and access equipment.

We also undertook the supply and installation of 5900 SQ/M of metal decking along with all shear studding completed on site by Struct Steel Eng’s own in house team and equipment.

Client: Heron Bros

Project Type: New 5 Story Office Building

Steel Tonnage: 350T

Project Location:L/Derry – Derry

  • Ebrington Office Blocks - under construction by structural steel engineering
  • Ebrin
  • Ebrington
  • Ebrington Office Blocks - under construction by structural steel engineering
  • Ebrington Office Blocks - under construction by structural steel engineering
  • Ebrington Office Blocks - under construction by structural steel engineering
  • Ebrington Office Blocks - under construction by structural steel engineering
Scroll to Top