Greenock Ocean Terminal
Project Description
SSE completed the full supply and installation of structural steel frame throughout the winter on the exposed west coast of Scotland.
The steel frame included 15.7 Tonnes of curved steel which required us to engage early with our supply chain in order to source and complete the process of multiple different members requiring specialist curvature treatment.
- Steel connection design
- Detailing, fabrication & erection of Structural Steel & Cold Rolled
- Liaising and coordinating with Main Contractor and Clients Design Team
- Installation of all precast stair flights and landings to 3 Nr stair cores
Client: Heron Bros
Project Type: Cruise Ship Visitor Centre
Steel Tonnage: 178T
Project Location: Inverclyde, Scotland